Working with occurrences > Managing absolute occurrences (in-context editing)
Override data in multiple contexts
You can create absolute occurrence data on a single line in more than one context. For example, you may want to override the find number in the context of the top-level assembly and the quantity in the context of a lower level assembly. Make these in-context edits in turn, ensuring you have selected the correct context (line) each time. The system shows the relevant absolute occurrence data for the current context and consequently data that applies to other contexts is hidden.
Note You cannot change the value of a property that is already overridden in a higher level context.
Source: https://docs.sw.siemens.com/documentation/external/PL20251212545240207/en-US/tc_help/pse/zyf1737253351290/fqt1737253352311/override_mult_contexts.html · retrieved Sat Jul 11 2026 00:00:00 GMT+0000 (Coordinated Universal Time)