IPP-create-time-phased-estimate

Description

This handler creates or updates the distributed cost for each FWP depending on whether the distributed cost table is present on the FWP.

If the distributed cost table is not present, the handler generates a time phased estimate on the FWP for each TaskInfo present on the parent WBS work package.

If the distributed cost table is already present, this handler updates the distributed cost table. If the property is outdated, the distributed cost is true on the FWP.

Syntax

IPP-create-time-phased-estimate

Arguments

This handler has no arguments.

Placement

Requires no specific placement.

Restrictions

None.

Note

A WBS work package is identified based on the Work Package check box on the WBS element revision.