Planning and executing an integrated program > Defining a program work breakdown structure > Creating an integrated product team
Assign an IPT to the WBS root
Assign a top-level IPT to the WBS root as follows:
Procedure
- Open the WBS root revision and click the Overview tab.
- Add the top-level IPT in the Assigned IPT section.