TeamcenterKnowledge

Task Flow and Alignment Setup

Set a change context to track alignment changes

You can align a design structure and an engineering BOM (Usage BOM or Assembly BOM) within the context of an active change notice. Additionally, you can track all information related to the alignment under a specific change notice. Any changes to the alignment can be viewed by accessing the change notice.

Procedure

To set a change context, click No Active Change in the global header and select the required change notice.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.dbom_ebom_alignment_usage/xid1971337 · retrieved 2026-07-11