TeamcenterKnowledge

Installing and configuring MBSE > Configuring MBSE > Configuring test management

Migrate test objects

You can use the migrate_verification_data utility to migrate design validation objects created prior to Teamcenter 12.4 and Active Workspace 5.0.

New validation design structure and objects

Prior to Teamcenter 12.4 and Active Workspace 5.0, the design verification feature was based on the following test package objects: Test, Test Request, Test Event.

Releases with Teamcenter 12.4 and Active Workspace 5.0 and later support the physical verification process with new objects. Object name changes:

  • Test Request is now called Test Method.
  • Test Event is now called Test Lab Procedure.

(The source documentation includes a diagram of the data organization; objects shown in green are the new design validation objects introduced in Active Workspace 5.0. All other objects are pre-existing.)

Run the migration utility

The migrate_verification_data utility migrates the physical verification data objects to the new study/run-based structure. For each existing combination of Test Request and Test Procedure, the utility creates a Test Request, and adds a Test Method and Test Procedure to the new Test Request.

The source documentation includes before/after diagrams showing several Test Request groups, each containing a Test Method/Test Procedure paired with multiple Test Events/Test Lab Procedures reorganized under the migrated structure (exact object counts and diagram layout are illustrative examples in the original documentation and are not reproduced here in full fidelity due to source table formatting).