Planning and executing an integrated program > Defining a program work breakdown structure > Creating an integrated product team
Assign an IPT to a WBS element and a work package
An IPT can be assigned at any level in the WBS structure. The IPT assigned at a particular level is inherited down to all the lower levels of the structure.
Assign an IPT to a WBS element or a work package as follows:
Procedure
- Select the WBS element or work package and click the IPT tab.
- Add the IPT in the Assigned IPT section.