TeamcenterKnowledge

Structure Management ─ Deployment and Administration

Date entry: Scenario

The Date entry allows users to configure product structures against a specific date. You must use the Date entry in conjunction with other entries, such as Status or Latest, to find the most recent revision before the specified date. A date entry is used for specifying a date to configure the structure against. You can only use this entry type with other entries. These types of entry find the latest entry before the specified date: Status entry – released date or effective date Latest entry – creation date You can set the date in a date entry to Today, and Teamcenter evaluates the configuration criteria against the current date and time. You cannot configure working revisions against a date in the past. Teamcenter does not maintain information about the revisions that were in a working state at a particular time in the past.

Note If no date entry is present in a revision rule, Teamcenter evaluates the date by default to today's date.

Source: https://docs.sw.siemens.com/documentation/external/PL20251212545240207/en-US/tc_help/administering_product_structures/qmd1737238832907/xkp1737238834247/item_rev_config_ir_entry_date.html · retrieved 2026-07-11