TeamcenterKnowledge

Comparing product structures > Comparing structures under change management > Viewing supersedure

Create delivered change

A change, rework, or re-identification of an original part that is assigned Delivered status can be tracked from the original item revision by creating a parallel revision sequence using the Save As command. For example, a parallel revision sequence for the delivered assembly Assy100/C can be based on the site number of the customer to whom the product was delivered, for example, #3382. This allows the item revision to continue the revision progression in a parallel path. You can perform a delivered product change and named design progression using the same change. The change process must be configured so that the delivered change is assigned special release status which is used to display delivered changes in supersedure.

Procedure In Change Manager, select the item revision you want to change. Choose File→Save As. The Save Item Revision As dialog box is displayed. Type the new Revision ID sequence. In the previous example, change the existing sequence of Assy100 to 3382. Optionally, type a description of the change. Click OK. Click Apply to save the changes to the database and leave the dialog box open for additional changes.

Source: https://docs.sw.siemens.com/documentation/external/PL20251212545240207/en-US/tc_help/pse/xzq1737253370295/lvc1737253373788/agq1737253375539/genid_create_delivered_change_32_1198.html · retrieved Sat Jul 11 2026 00:00:00 GMT+0000 (Coordinated Universal Time)