Structure Manager / BOM Management — Customer Case Studies

Source type: Siemens-published case studies (resources.sw.siemens.com), directly fetched and read.

Shanghai Huizhong Automotive Manufacturing Co., Ltd.

Company background: Founded 1992, headquartered in Shanghai; specializes in chassis systems for passenger and commercial vehicles. Operates one R&D center, 12 production facilities, and five joint ventures. Customers include Shanghai Volkswagen, Shanghai General Motors, and SAIC Motor (its parent). Notably the first Chinese chassis manufacturer accepted as a General Motors supplier for GM's EPSILON II global platform.

Implementation timeline (2009–2013), in three phases:

  • Phase I (Jan. 2010): PDM system managing design data and digital drawings; generated engineering BOMs (EBOMs) with product structures and 3D mockups.
  • Phase II (Oct. 2011): Extended to research projects and simulation data; integrated design BOMs with SAP and with NX/CATIA CAD tools.
  • Phase III (Dec. 2013): Process management module enabling automatic process BOM (PBOM) generation and concurrent product-process modeling.

Resulting BOM chain: EBOM → automatic PBOM generation → manufacturing BOM (MBOM) → deployed to ERP/MES systems for production.

Results/benefits (qualitative — no hard numbers given in the case study):

  • Unified specifications and standards across distributed facilities
  • "Effective management of engineering data" and "streamlined manufacturing process management"
  • An "integrated PLM platform across all business segments"
  • Described as laying the "foundation in place to realize advanced PLM capabilities and benefits"
  • "Enterprise-wide standardization"

Source: Implementing Teamcenter to establish an enterprise-wide digital manufacturing platform and best practices

Shanghai Real Information Technology

Company background: Chinese digital R&D solutions provider serving the automotive/transportation sector since 2005. Two business divisions: digital enterprise solutions and intelligent R&D services. Supports 230+ customers on digital transformation. Holds Siemens Expert Partner status specializing in Teamcenter implementation. (This case study is about Real Information Technology as a Siemens implementation partner, describing work done for its own automotive-industry customers — it is one level removed from a direct end-user case study.)

Implementation highlights:

  • Data centralization: consolidated dispersed organizational BOM data into a unified system; built custom mobile apps letting users "browse, present and approve data from any location."
  • BOM conversion optimization: standardized procedures to improve conversion efficiency of CAD BOMs into engineering, software, and manufacturing BOMs, for consistency through product development.
  • FMEA integration: implemented failure-mode-and-effects-analysis templates inside Teamcenter, including database construction and historical defect-data linkage to speed FMEA creation.
  • Infrastructure: increased server capacity to resolve performance bottlenecks that were limiting IT system efficiency (an implicit acknowledgment that BOM/PLM performance issues at scale are a real operational concern, consistent with what's noted in structure-bom-effectivity-and-implementation-pitfalls.md).

Quantified results (the only case study in this set with hard numbers):

  • R&D cycle time reduction: 17.5%
  • R&D quality improvement: 23% at one customer, 30% at another
  • Overall R&D efficiency improvement: 14%
  • Enhanced BOM management accuracy and cross-departmental data access (qualitative)

Source: Using Teamcenter to increase BOM management

Our Next Energy (ONE) — mentioned but not independently verified here

Saratech's blog (see structure-bom-ebom-mbom-alignment-and-eto.md) references Our Next Energy, an EV technology company, transitioning from basic PLM to Siemens tools and implementing separate CAD/EBOM/MBOM structures, with the stated benefit of letting departments work independently while staying aligned. This was not a dedicated case-study document — it appears as a brief customer mention inside a Saratech blog post, with no further quantified detail available. Flagged here for completeness rather than treated as a fully sourced case study.

Notes / caveats

  • Both fully-sourced case studies are Chinese automotive-sector Siemens customers/partners; this reflects what surfaced in search, not a deliberate industry filter. No case studies from aerospace, industrial machinery, medical device, or other sectors specific to Structure Manager/BOM management were found in this research pass (in contrast to some other Teamcenter modules in this KB, e.g. Weight & Balance's Piper Aircraft case study).
  • Both case studies are Siemens-published marketing collateral, not independent audits — treat quantified figures (17.5%, 23%/30%, 14%) as customer/vendor-reported, not third-party verified.
  • No additional customer case studies specific to Structure Manager/BOM Management (as opposed to Teamcenter broadly) were found beyond these two despite multiple search variations.