Generate schedules for a change or deliverable
As a program manager, you can generate schedules at the event-level for a change (impacted items) or deliverables (program deliverables or deliverable instances). The schedule can be created for each impacted item in a change, or each deliverable instance (e.g. parts, drawings, or documents), or for the program deliverables (the high-level container for the deliverable instances).
Note: If your administrator has configured Teamcenter project security, the schedule will be assigned to the same Teamcenter Tc_project as the parent program.
Procedure
- Navigate to the event in your folder structure or from the program timeline.
- Select the desired event and click Open.
- Do one of the following:
| To | Do |
|---|---|
| Generate a schedule for a change. | Click the Changes tab. Select the change from the list. |
| Generate a schedule for a deliverable. | Click the Deliverables tab. Select the deliverable from the list. |
- Click More Commands > Manage > Generate Schedules.
Note: The Generate Schedules command is only available when the property Schedule Required is set to True.
- In the Generate Schedules panel, do the following:
- If generating a schedule from a deliverable, in the Source box, select the input source for the schedule (either program deliverable or deliverable instances). If generating from a change, this field defaults to Impacted Items.
- Select Start Date for this schedule to start on the event's start date, or select Finish Date to have the schedule end by the event's planned finish date.
- Define the Reference Date for the schedule (the reference date will be the start date of the schedule).
- Click Generate Schedules. The schedule name will contain the name of the ECN or impacted item that the schedule was created for.
- (Optional) Click Alerts to verify that the schedule generation request was sent. A separate alert is sent when the schedule is successfully created.
- View the generated schedule from the Schedules tab.